Bathroom renovation
The main bathroom renovation includes demolition and construction of new walls, replacement of the electrical network and sewage system, removal of old flooring and tiles, floor screed, plastering and painting the ceiling, installation of tiles, installation of bathroom furniture - bathroom cabinets and shelves, installation of a monoblock, toilet, sink, mixer, shower, shower cabin, installation of bathroom accessories, finishing works according to the client's project — approximate implementation period: 1 month.
In the current project, the bathroom and toilet are separate. The wall between them and the unstable walls of the bathroom have been torn down.
The floor has been torn down, and the sewage system has been replaced. The walls and ceiling are built with Ytong blocks and waterproof drywall with metal profiles. A niche has been created for the washing machine, which is open to the corridor. The ceiling is finished with high-quality bathroom latex, and the walls - with faience tiles. The floor is finished with self-leveling screed and faience tiles.
A window has been made in one of the walls. A seat has been built under the shower with aerated concrete blocks. A monoblock (toilet), sink, mixer, and shower head were installed. Fans, ventilation grilles, and lighting fixtures have been installed.